Projects
The table below containing several successful projects that we proud of
Project name | Cost | Beneficiary | Date complete the job |
PROVISION OF SUPPLY AND DELIVERY OF ONLINE CRUDE OIL WATER AND SALT ANALYZERS FOR PETRONAS CARIGALI IRAQ HOLDING B.V. | 498,000 $ | PETRONAS | 2018 |
Start-up commissioning and training for analytical equipment provided as a part of Petronas Garraf project | 17,600 $ | Pioneer | 2019 |
The asphalt cladding of a road in Daghara, with a length of 5.5 km | 605.500.000 IQD | Diwaniyah | 2020 |
Rehabilitate Diwaniyah –Najaf entrance of 1st level | 4.275.904.710 IQD | Diwaniyah | 2007 |
Improve and develop Diwaniyah entrance road ( bid 113 of 2008) | 4.502.600.000 IQD | Diwaniyah | 2008 |
Implement the second phase of Eagle crossroad till Abu Al-Fadhil crossroad ( bid 128 of 2008) | 2.504.265.000 IQD | Diwaniyah | 2008 |
Implement electricity network with removal the old network bid no.180 | 2.462.095.000 IQD | Al-Anasr and Al-Abrar neighborhoods | 2014 |
Supply and install electricity network | 1.375.350.000 IQD | 14 Ramdan area , Al-Bu Dhahir area – Al-Omran village and Al-Sawalat | 2014 |
Rehabilitate part of Al-Nooria Feeder from Shafia station | 1.189.862.000 IQD | Al-Nooria | 20014 |
Implement electricity networks | 1.985.455.000 IQD | Al-Hamda-Om Al-Adham –Om Al-Adham 1st – Al-Bu Makan –Al-Baty –Al-Nadhiria village – Falih Al-Salman 2nd – -Al-Zwair –rehabilitate Hamza village feeder-Al-Sader –madeen | 2014 |
Rehabilitate Al-Tharam feeder with implement illumination line | 1.493.630.000 IQD | Affak district | 2014 |
Construct a school 12 classrooms | 634,000 $ | Multi-national forces –Safwan area | 2008 |
Construct a school 6 classrooms | 287,000 $ | Denmark Forces-Abo Sakhar | 2008 |
Construct a school 6 classrooms | 183,000 $ | British Forces –Al-Najmi | 2008 |
Construct a school 3 classrooms | 192.000.000 IQD | Un-Habitat Org. | 2008 |
Rehabilitate 10 schools | 486.000.000 IQD | Relief Org. | 2008 |
Construct Cornish Al-Jabaish (3rd level ) | 2.597.027.750 IQD | Dhi Qar province | Work accomplishment rate 85% |
Bid 88 of 2013 Reconstruct schools at Al-Budair 1, Affak3,Sumer1 ,Neffer 1 | 1.160.109.000 IQD | Al-Budair, Affak , Sumer , Neffer Districts | 2020 |
Bid no.112 of 2013 construct primary school with 6 classrooms at 16 Village of Sania | 629.725.000 IQD | Sania sub-district | 2019 |
Construct four gardens and parking bid no.422 of 208 | 418.604.000 IQD | Al-Budair municipality | 2009 |
Bid no.440 of 2008 , construct Al-Budair parking | 350.365.000 IQD | Al-Budair sub-district | 2009 |
Developing Cornish Al-Akakar village in Dhi Qar | 320.818.350 IQD | Al-Akakar Municipality | 2013 |
Bid no.91 within developing regions of 2011 – construct veterinary hospitals in Neffer | 246.875.500 IQD | Neffer | 2012 |
Build an extra annex 6 classrooms at Al-Jamahir school | 165.518.000 IQD | Diwaniyah Education directorate | 2011 |
Bid no.18 of2011 expansion part of Al-Budair entrance | 90.454.000 IQD | Diwaniyah-Al-Budair | 2011 |
Casting pavements with curved stone plus sided mold in Al-Sader | 39.450.000 IQD | Al-Sader sub-district | 2013 |
Construct Garage building with budget of 2009 | 24.998.000 IQD | Al-Budair sub-district | 2009 |
Cast internal pavements in college of medicine with curbstone | 36.862.500 IQD | College of Medicine | 2010 |
Supply and install galvanized illumination poles for internal streets in college of medicine | 17.200.000 IQD | College of Medicine | 2010 |
Supply sub base material 3000 m3 | 49.500.000 IQD | Al-Shanfia municipality | 2018 |
The table bellow containing several successful projects that we proud of
Project name | Cost | Beneficiary | Date complete the job |
PROVISION OF SUPPLY AND DELIVERY OF ONLINE CRUDE OIL WATER AND SALT ANALYZERS FOR PETRONAS CARIGALI IRAQ HOLDING B.V. | 498,000 $ | PETRONAS | 2018 |
Start-up commissioning and training for analytical equipment provided as a part of Petronas Garraf project | 17,600 $ | Pioneer | 2019 |
The asphalt cladding of a road in Daghara, with a length of 5.5 km | 605.500.000 IQD | Diwaniyah | 2020 |
Rehabilitate Diwaniyah –Najaf entrance of 1st level | 4.275.904.710 IQD | Diwaniyah | 2007 |
Improve and develop Diwaniyah entrance road ( bid 113 of 2008) | 4.502.600.000 IQD | Diwaniyah | 2008 |
Implement the second phase of Eagle crossroad till Abu Al-Fadhil crossroad ( bid 128 of 2008) | 2.504.265.000 IQD | Diwaniyah | 2008 |
Implement electricity network with removal the old network bid no.180 | 2.462.095.000 IQD | Al-Anasr and Al-Abrar neighborhoods | 2014 |
Supply and install electricity network | 1.375.350.000 IQD | 14 Ramdan area , Al-Bu Dhahir area – Al-Omran village and Al-Sawalat | 2014 |
Rehabilitate part of Al-Nooria Feeder from Shafia station | 1.189.862.000 IQD | Al-Nooria | 20014 |
Implement electricity networks | 1.985.455.000 IQD | Al-Hamda-Om Al-Adham –Om Al-Adham 1st – Al-Bu Makan –Al-Baty –Al-Nadhiria village – Falih Al-Salman 2nd – -Al-Zwair –rehabilitate Hamza village feeder-Al-Sader –madeen | 2014 |
Rehabilitate Al-Tharam feeder with implement illumination line | 1.493.630.000 IQD | Affak district | 2014 |
Construct a school 12 classrooms | 634,000 $ | Multi-national forces –Safwan area | 2008 |
Construct a school 6 classrooms | 287,000 $ | Denmark Forces-Abo Sakhar | 2008 |
Construct a school 6 classrooms | 183,000 $ | British Forces –Al-Najmi | 2008 |
Construct a school 3 classrooms | 192.000.000 IQD | Un-Habitat Org. | 2008 |
Rehabilitate 10 schools | 486.000.000 IQD | Relief Org. | 2008 |
Construct Cornish Al-Jabaish (3rd level ) | 2.597.027.750 IQD | Dhi Qar province | Work accomplishment rate 85% |
Bid 88 of 2013 Reconstruct schools at Al-Budair 1, Affak3,Sumer1 ,Neffer 1 | 1.160.109.000 IQD | Al-Budair, Affak , Sumer , Neffer Districts | 2020 |
Bid no.112 of 2013 construct primary school with 6 classrooms at 16 Village of Sania | 629.725.000 IQD | Sania sub-district | 2019 |
Construct four gardens and parking bid no.422 of 208 | 418.604.000 IQD | Al-Budair municipality | 2009 |
Bid no.440 of 2008 , construct Al-Budair parking | 350.365.000 IQD | Al-Budair sub-district | 2009 |
Developing Cornish Al-Akakar village in Dhi Qar | 320.818.350 IQD | Al-Akakar Municipality | 2013 |
Bid no.91 within developing regions of 2011 – construct veterinary hospitals in Neffer | 246.875.500 IQD | Neffer | 2012 |
Build an extra annex 6 classrooms at Al-Jamahir school | 165.518.000 IQD | Diwaniyah Education directorate | 2011 |
Bid no.18 of2011 expansion part of Al-Budair entrance | 90.454.000 IQD | Diwaniyah-Al-Budair | 2011 |
Casting pavements with curved stone plus sided mold in Al-Sader | 39.450.000 IQD | Al-Sader sub-district | 2013 |
Construct Garage building with budget of 2009 | 24.998.000 IQD | Al-Budair sub-district | 2009 |
Cast internal pavements in college of medicine with curbstone | 36.862.500 IQD | College of Medicine | 2010 |
Supply and install galvanized illumination poles for internal streets in college of medicine | 17.200.000 IQD | College of Medicine | 2010 |
Supply sub base material 3000 m3 | 49.500.000 IQD | Al-Shanfia municipality | 2018 |